It is not too late, but the order of work changes

Many families in Los Angeles call a designer when the walls are already up. The shell is fixed, some furniture is ordered, and the house still does not feel like one piece. It is a common situation, and it can be handled well if the designer starts from what already exists instead of from a blank page.

What is fixed and what is still open

Once construction is under way, walls, windows, ceiling heights and the main plumbing and electrical runs are usually set or expensive to change. What is still open is most of what you see and touch every day.

Start with an inventory

The first step is a list of what is already decided: the plans as built, the orders that have been placed, the materials on site. In Marble Home in Chatsworth, construction had started and much of the furniture was ordered, so we built the design around what the owners already had and reached the look they wanted, a rich modern home, with calm and simple solutions.

Work in the order of the construction schedule

Decisions that the builder needs first come first. Lighting and electrical points are needed before drywall is closed, cabinetry and stone need lead time, and loose furniture can wait. Matching the design schedule to the construction schedule keeps the site from stopping while it waits for answers.

Use one material language for the whole house

When pieces were chosen at different times, a consistent set of materials ties them together. In Marble Home each zone has its own marble, walnut cabinets run through the main kitchen, and fireplaces repeat in the living room, by the kitchen and in the main bedroom, so the house reads as one design.

Show the result before it is built

Realistic 3D views of each room let the owners see the ordered furniture together with the new finishes and lighting and approve the whole picture before the builder installs anything. It is the fastest way to catch a clash between what was bought and what is planned.

By Albert Galstyan · November 16, 2026

Related projects

Images are visualizations unless stated otherwise.

Questions

Is it too late to hire a designer during construction?

No. Finishes, lighting, joinery and furniture are still open for most of the build. The earlier you start, the more electrical and plumbing points you can still adjust.

Do you work with our existing contractor?

Yes. We prepare drawings and specifications the builder on site can work from and stay involved through site visits.

Let’s talk about your project!

Excited to begin your design journey? We're here to help you bring your vision to life and create something truly extraordinary together.