A condominium in a tower is a different project from a house. You own the space inside your walls, but the building owns the structure, the shafts and the rules for how work is done. The city still issues the permits. Here is what owners on the Wilshire Corridor, in Century City and in Downtown should know before they start.
Two approvals: the association and the city
Most condominium associations require their approval before an owner makes physical changes to a unit. In California the Davis-Stirling Act sets the ground rules: the association must have a written procedure with a maximum time to respond, must decide in good faith and in writing, and must explain any refusal and how to ask the board to reconsider.
The building department of your city reviews the work separately. In the City of Los Angeles that is LADBS. Association approval does not replace a building permit, and a permit does not replace association approval. Plan for both from the start.
What the association usually asks for
Every building has its own rules, but the list is usually similar. Read your CC&Rs and the building's alteration rules before design starts, because they shape the design.
- Drawings and a description of the work before anything begins
- A signed alteration agreement, the contractor's licence and insurance, and sometimes a deposit
- Working hours, elevator reservations and protection of common hallways
- Rules for hard floors, usually sound insulation under new stone, tile or wood
- Limits on changes to plumbing, ventilation and anything that touches the building's shafts or exterior walls
What can move and what cannot
Interior partition walls can usually move. Columns, structural walls, the shafts that carry pipes and air between floors, and the exterior glass cannot. Kitchens and bathrooms can move only as far as their drains can reach the existing risers with the slope they need, which is why a good condo plan starts with a survey of where the risers are.
Ceilings are often lowered in places to hide new ducts and lighting. Planning those dropped areas as part of the design, around the dining table or along a hallway, keeps the rest of the room at full height.
Asbestos survey before work starts
In the South Coast Air Quality Management District, which covers Los Angeles County, Rule 1403 generally requires an asbestos survey before renovation or demolition begins. The district states that condominiums are not single-unit dwellings, so the exemptions for houses do not apply. Older towers in particular may have asbestos in ceiling texture, flooring or mastic. Order the survey early; its results can change the schedule.
Floors and noise
Hard floors carry footsteps to the unit below. Many buildings require a tested sound underlayment beneath new stone, tile or wood, and some set a minimum rating. Choose the floor and the underlayment together, and check the total height against door thresholds and the kitchen and bathroom floors.
An example: Wilshire Residence
Wilshire Residence is a three-bedroom condominium of about 2,830 sq ft high up in a tower on the Wilshire Corridor in Westwood. We drew a new floor plan around the building's columns and risers and designed every room, from a black and white marble hall to a main bathroom in white and black marble, with plumbing, electrical and lighting plans for the builders. The design is complete and the home is under construction.
By Albert Galstyan · November 23, 2026


